Things tagged 'cycle-route'

limited to the area of Epping Forest Transport Action Group:

3 issues found for 'cycle-route':

  • Theydon Bois to Debden (CAP App. I.11.2)

    Created by Chris Lord // 1 thread

    Improve Non-Motorised User connectivity between Theydon Bois and Debden.
    * Approx. 1.5 mile length part on-road and part off-road scheme that would link Theydon Bois Tube Station and Town to Debden and Loughton Tube Stations and their shops and services.
    Longer Term
    £300,000

    Please sign in to vote.
  • Roding Cycle Hub Route: Loughton & Chigwell Greenway & Quietway (CAP App. I.10)

    Created by Chris Lord // 1 thread

    Currently there is no safe cycle route between South Loughton / West Debden and Chigwell School. This safer off-road route could be popular with school children and their parents. At Highwood Lane end the route could connect with Debden via Oakwood Hill and Loughton (Traps Hill) via Alderton Hall Lane north.
    * Approx. 1 mile length part on-road and part off-road scheme from London Square (Chigwell) via Grange Farm Lane.
    * Section 1: Approx. 1 mile length part on- road (via provision of signage and road markings) and part off-road scheme (a new unlit 3m wide shared cycle route facility) from London Square (Chigwell) via Grange Farm Lane, crossing the River Roding via an existing bridge and on to Highwood Lane.
    * Section 2: Provision of an on-road cycling route in both directions along Oakwood Hill, made possible through parking restrictions and removal of the central hatching/wide centrelines.
    * Section 3: Provision of an on-road cycling route in both directions along Alderton Hall Lane and Traps Hill, via signage and road markings, and parking restrictions/formalisation where required.
    Medium Term
    £500,000 (Assumes route is not a PROW and excludes stats diversions)

    Please sign in to vote.
  • Forest rd (Wolesey ave-Bromley rd)

    Created by Gerhard Weiss // 1 thread

    Plans for a new scheme can be found here http://www.walthamforest.gov.uk/Documents/Forest%20Rd%20-%20Consultation%20Leaflet.pdf

    We have met with an engineer on site and generally agreed with the principle: proper cycle lane uphill but no cycle lane down hill, removal of pinch points, raised zebras 2 wide lanes outside William Morris with removal of pinch points, no real change further east before The bell junction will be improved.

    Please sign in to vote.

12 threads found for 'cycle-route':

No library items found for 'cycle-route'.

No planning applications found for 'cycle-route'.

Back to top